About the MFR
Friday, March 5, 2021
How-To: Terrific Trackwork!
Monday, February 1, 2021
Just Trains! - Episode 1
People seem to really respond to any video that I put out showing trains running on the layout. (probably because it is proof that I am ACTUALLY making forward progress, slow though it may be.)
So I decided to put out a video of just trains. This first one is a learning experience, but one of the more enjoyable videos I've produced so far, so be ready for many more in the future!
Tuesday, January 26, 2021
Reflections and Resolutions
It's still January so it is still ok to post one of those "resolutions" videos right?
Lot's of plans this year. Mainly I want to get my layout completely operational and to a "base layer" of "scenery" over the entire railroad. This is mainly so I can begin to have REAL operating sessions on the layout and comfortably run trains without the risk of loosing expensive equipment due to an unexpected plummet into carpet canyon.
More resolutions and reflections in the video below. 2021, here I come!
Wednesday, May 20, 2020
Interview with Model Railroading Live!
Check out the video below or click here to watch it on YouTube.
Monday, January 20, 2020
Simple and Solid Benchwork
Thursday, January 2, 2020
Model Railroad Resolutions
In this video, I discuss my resolutions for 2020 and share what I'd like to get done on my model railroad this year.
Monday, August 5, 2019
Layout Update #6 - Buried in Benchwork: Part 2
Monday, July 22, 2019
Movie Mondays #13
Tuesday, July 2, 2019
Rail Ramblin' - The Perfect Layout Size and More!
Friday, May 31, 2019
Rail Ramblin' - Why Model Railroading?
Monday, May 6, 2019
Movie Mondays #12
Monday, April 22, 2019
Layout Update #5 - Buried in Benchwork: Part 1
(Side note: the camera on my phone is busted and is just not cutting it anymore. I've gotta look into getting something better for future updates I think.)
Tuesday, March 12, 2019
Layout Update #4 Waste Not (should have been called "Laser Beams and Razor Blades")
This month I discuss fascia color, layout height, and more!
Wednesday, February 6, 2019
Layout Update #3 - Construction and Destruction
Wednesday, January 2, 2019
Layout Update Video #2 - New Toys, New Wall, New Year Resolutions
Sunday, November 25, 2018
The Track Plan
Whelp, I've done it. I've finally landed on a track plan for my new layout. This plan is the result of months of design and deliberation. It incorporates nearly all of the features I love in model railroading and should provide me many years of enjoyment. I go in-depth into the design of the track plan in the following video:
- Lehigh Cement: With operations beginning in 1911, Lehigh Cement is the oldest rail-served industry in the valley, This historic factory once towered over the town of Metaline Falls however, the factory's advanced age along with rail service concerns required the owners to shutter operations at it's original location and build a new, modern plant south at Usk Washington. The factory ships 5-6 2-bay covered hoppers an operating session.
- Ponderay Newsprint Company: Ponderay has been the one of the valley's largest rail customers since it began operations in 1989. The plant ships around 2-3 boxcars loaded with newsprint an operating session and receives boxcars loaded with recycled paper materials as well as tank cars loaded with kaolin and other chemicals on an as-needed basis.
- Vaagen Bro's Lumber Company: Part of the Idaho Forrest Group, this mill has been supplying America with high quality wood products for decades. Due to a recent lull in the new construction market, the mill only ships 2-3 loads of lumber on center partition cars each operating session.
- Tri-Pro Poll Mill: The mill Generally ships around 1-2 custom built bulkhead flat cars loaded with poles an operating session.
- Pacific Steel and Recycling: A small employee-owned recycling facility which receives loads of scrap steel and other recyclable products via boxcar and gondola only on occasion.
Monday, September 17, 2018
Layout Update Video #1 - Surveying the Space
Thursday, September 13, 2018
End of an Era
I had created this very scenario for my railroad back in 2013 as a convenient explanation for why I didn't model the railroad as far north as Metaline Falls. Having just a small shelf-style switching layout, there was no way to include both the bridge and the cement plant all the way at Metaline Falls. Using the justification of "It was just too expensive to maintain the line north of town" seemed plausible at the time and unfortunately it's become a reality.
I'm really sad to learn of this development as I had hoped to one day take that railfanning excursion along the old Metaline Falls Branch. Now that it is gone, I almost want to find a way to work the town of Metaline Falls back into my model railroad as a metaphorical middle finger to the gods of eventuality. I don't think I can make that happen and still meet my goals for this layout however, so for the time being I'll continue including the abandoned trackage north of Box Canyon (while being able save the bridge itself) as part of my freelanced scenario.
I do feel a bit better however knowing that I will still be able to watch trains lumber over that majestic old bridge in miniature on my own little piece of the pacific northwest.
